Polyurethane Waterproofing @Depo Construction of LRT Jakarta Corridor 1 (Phase 1) Kelapa Gading – Velodrome

Period          : July 20 – November 11, 2019

Contractor   : Wijaya Karya (Persero) Tbk, PT

Owner          : Indonesian Ministry of Public Works & Housing

Products       : Renderoc FC, Conbextra EP10TG, Nitobond EC, Nitoproof PU1K (FOSROC)

 


Kings Shopping Center Bandung

Period          : March 27, 2018 – May 29, 2019

Contractor   : Mitralanggeng Prama Konstruksi, PT

Owner         : Alvin Rudi, Mr

Products     : Cebex 100, Nitoproof RS & Nitoproof 600 (FOSROC)

 


Rajamandala Hydroelectric Power Plant

Period         : May 17, 2018 – March 29, 2019

Contractor  : Cipta Rupa Pertama, PT, Multi Karya Engineering, PT & Tekniko Indonesia, PT

Owner         : Hyundai Engineering Co. Ltd

Products     : Cebex 100, Nitocote AC, Nitobond EC, Conbextra EP10TG (FOSROC), Sikafloor®-81 EpoCem® New HC (Sika), CYH-500, CYH-202, PM-3 & EPL-550; polyurethane-polyurea hybrid spray coating system (JTCC)

 


PTPV/ TVM (Touch Voltage Membrane) Construction of LRT Jakarta Corridor 1 (Phase 1) Kelapa Gading – Velodrome

Period         : April 18, 2018 – August 16, 2018

Contractor  :  Wijaya Karya (Persero) Tbk, PT

Owner         : Indonesian Ministry of Public Works & Housing

Products     : Malech, Mapeplan TVM, Mapejoint T-Lock Control Joint & Plastimul PU-W (MAPEI)

 


Pavement Entrance @Selaras Alam Residence, Bandung Barat

Period         : March 2-7, 2018

Contractor  : Cipta Rupa Pertama, PT

Owner         : Selaras Alam Residence

Products     : Nitoflor Hardtop Red Colour (FOSROC)