Rajamandala Hydroelectric Power Plant

Period         : May 17, 2018 – March 29, 2019

Contractor  : Cipta Rupa Pertama, PT, Multi Karya Engineering, PT & Tekniko Indonesia, PT

Owner         : Hyundai Engineering Co. Ltd

Products     : Cebex 100, Nitocote AC, Nitobond EC, Conbextra EP10TG (FOSROC), Sikafloor®-81 EpoCem® New HC (Sika), CYH-500, CYH-202, PM-3 & EPL-550; polyurethane-polyurea hybrid spray coating system (JTCC)