Siemens Warehouse at Bandung

Period    : January 15, 2012 – March 9, 2012

Contractor: Sinarindo, PT

Owner     : Siemens Industrial Power, PT

Products  : Nitoflor Hardtop, Conbextra GP (FOSROC), EpoFloor 300µ (CRP).

 


Stek Rebar Fixing System D16, D19 & D22 at Astra Otoparts Project, Deltamas Cikarang

Period    : January 7 – March 17, 2012

Contractor: Multibrata Anugerah Utama, PT

Owner     : Astra Otoparts, PT

Products  : EPCON G5 (RAMSET).

 


Floor Crack Injection Repair at Tempo Scan Pacific, Lippo Cikarang

Period           : March 2-17, 2012

Contractor  : Multibrata Anugerah Utama, PT

Owner            : Tempo Scan Pacific Tbk, PT

Products       : Nitobond EC (FOSROC), Tom Inject (CRP)