Stek Rebar Fixing System D16, D19 & D22 at Astra Otoparts Project, Deltamas Cikarang Pekerjaan Pemasangan Stek D16, D19 dan D22 di Proyek Astra Otoparts, Deltamas Cikarang

Period    : January 7 – March 17, 2012

Contractor: Multibrata Anugerah Utama, PT

Owner     : Astra Otoparts, PT

Products  : EPCON G5 (RAMSET).

 

Periode          : 7  Januari – 17 Maret  2012

Kontraktor  : Multibrata Anugerah Utama, PT

Owner            : Astra Otoparts, PT

Produk          : EPCON G5 (RAMSET)

Leave a Comment

Scroll to Top